Study of inverse siphon structure construction on the Nissan river and its diversion depended structures

Study of inverse siphon structure construction on the Nissan river and its diversion depended structures

Client: Ministry of Energy/ Khouzestan Water and Power Authority
Project's geographical location: Khuzestan province- the end of Karkhe river in the scope of Susangerd city
Project description:

The aim of this project is to pass WMD drainage from the Nissan River and the diversion of the Nissan River at the site of structure. Studies on the construction of the inverse siphon structure of the Nissan River and river-dependent structures were assigned to the River Engineering Company of Sazenpardazan Consulting Engineering. The project range is at the intersection of WMD drainage with the Nissan River. This range is located in an area of agriculture. The entire pattern range is about 58 acres.
Reverse siphon structure, approximately 160 m, reinforced concrete, Calvert Dimensions: 7.2 m/2 m.
input and output structures plus vent and stop-construction of protective dike as a arc ring around the input and output structures to the height of 2m and the width of the 3th slope of the 2-second gradient, construction of two khaki bands as upstream cofferdam and downstream of 8 m height and the width of the Crown 3 subway 1.5 horizontal slope to 1 vertical construction of the diversion channel to the width of 25 meters and the overall width of 50 m construction of a protective dike in the right side of diversion channel to 2 meters height and width 3rd Tilt 2 horizontal to 1 vertical
input and output structures with valve and stop-slide