Study of briefly environmental assessment of Mahshahrs Irrigation and drainage networks

Study of briefly environmental assessment of Mahshahrs Irrigation and drainage networks

Client: Ministry of Energy- Khouzestan Water and Power Authority
Project Geographical location: Kouzestan Province- the north to Mahshar county- the Jarrahi River's margin

Project description:

The Mahshahr irrigation and drainage network is in the breadth with 10 thousand hector including 16 main and sub drainage which collect the drain water of lands and drain into Shadegan wetland by utilizing two pumping stations with totally 5 cubic meter per second. The purposes of executing this plan are including in the below:
Constructing suitable drainages owing to preventing and decreasing soil salinity and lands water suffusion
Constructing evaporated ponds, water and drainage channels dredge for controlling storm water pollution
Utilizing biological methods instead of chemical poisons
Constantly monitoring of the plan's environment
Agriculture development and create carrier opportunities in the region
The environmental impacts of Irrigation and drainage networks constructing divide to creating and exploiding periods which the first one is more important owing to its long- term time line
The matrix method has been utilizing in this assessment. During  contributing researching the positive effects of the project have been estimated equal 65.6 percent and the impacts equal 34.4 percent which illustrate the positive effects are more significant considerably than impacts. Therefore this plan is capable to conducting by boosting positive effects and reducing its impacts.