Risk Study and environmental risk of 40 kilometer pipeline of 8 inch of Gas liquid transmission of Gas and liquid Gas factory 1200 into multi ways 90

Risk Study and environmental risk of 40 kilometer pipeline of 8 inch of Gas liquid transmission of Gas and liquid Gas factory  1200 into multi ways 90

Employer: Ministry of oil and Gas, National Iranian south Oil company
Project's Geographical Location: Khouzestan and Kohgilooye Boyerahmad Provinces, between Behbahan and Gachsaran cities

Project description:

In order to conducting Risk studies and environmental risk assessment of this plan, after site visiting, reviewing maps and holding specialize meeting with client, in order to conducting qualify and environmental risk studies ,HAZOP and HAZID methods and result (consequence) modeling in PHAST software  and QRA method was used in order to conducting quantity Risk Assessment.
In these studies, utilizing mentioned methods and expertise analysis, the plan's weakness points , in the length of pipeline path were identified and the amount of predicted risk was estimated as quantity  and operative solutions were presented to the client.QRA study's results illustrated which in the case of fraction event in pipeline, near the Abchel village, the calculated risk value will be more than acceptable value.