Study, Designing and Supervision to implement water supply of Ramhormoz city

Study, Designing and Supervision to implement water supply of Ramhormoz city

Employer: Ministry of Energy, Khouzestan Water and Power Authority
Project Geographical Location: Khouzestan Province - Ramhormoz county
Project Description:
Decreasing  trend of Aala river's quality as well as decreasing its discharge, have provided some problems for residents, as the one of water supply resources. The authorities made decision to replace a proper water supply resource to solve this defect.
In the first stage, by identify one groundwater with proper quality in the scope of Joyji village , digging 11 well in this place at the aim of discharge supply 200 lit/s was considered as short-term solution
As well as , in the second phase, the completely plan of water demand supplying  by drilling  5 well in Beneh Akhond region by discharge 250 lit/s. this unit has been designed and implemented by equipped with telemetric system as total data and characteristic of current situation of water contour level in tanks. Open and closing all of valves , turning out pumps, out let discharge of every well, chlorination system and the percentage of chlorine in water is displaying in central pc and is controlable at the same way, in the special cases the central system will alarm.