Employer: Arvand Free Zone Organization Project Geographical Location: Khouzestan - Abadan County Project description: Presently, industrial wastewater located in the west site of Arvand Free Zone is draining to the Karun river as treated or pretreated that undoubtedly this issue can be lead to environmental disaster in the largest river of Iran particularly after starting other native industries in region. That is why industrial wastewater transmission of the west site of Arvand Free zone to wastewater plant and treatment plant designing was assigned to Sazabpardazan consulting Engineering company at the purpose of the west site green space irrigation based on agriculture and green space irrigation standard and also by considering wastewater drain standard to the Karoun river in special condition like flood phenomena happening Investigated choices for industrial wastewater treatment First choice: Anaerobic lagoons and Aerated lagoons Second choice: Anaerobic Lagoons and completing mixing activated sludge Third choice: two-stages activated sludge Fourth choice: UASB and Activated sludge with extended aeration Eventually UASB and activated lagoon with extended aeration was selected as better technical and economic choice Identification of the best Wastewater treatment choice This choice is including the following parts
Inlet channel
Mechanical screening
Flow Measurement
Anaerobic sludge bed with flow (UASB)
Extended aeration lagoon
Gravity thickener (consolidation)
Sedimentation lagoon
Pressure filter
Chlorination
The points of the best choice (UASB, Activated Sludge and Extended Aeration)
Less space demand
Decreasing the construction operation volume
No need to Sludge digesting equipment
High assurance capability as treatment plant function