Geotechnical engineering studies and design of passage of 16 inches and 32 inch gas pipelines from Ramshir Hddriver To Horizontal Drilling method
Client: Ministry of Oil - National Iranian south Oil company Project's Geographical location: Khalf Abad Bridge - Ramshir- Khuzestan Project Discription:
This project has been implemented in order to study geotechnical engineering and design of passage of 32 and 1 6 inches pipelines from under the substrate of Ramshir River using the directional drilling method. The engineering services provided in this project are as follows: • Conducting field studies, identifying seasonal changes of river, obstacles, facilities and existing constraints. • The topographic map of the region and the existing status of the lines • Initial design of routes profile to cross the lines and compare them • Check the selected profile to determine the coordinates of key points • Drilling operations 10 borehole deep40 m during the selected profile • The laboratory of Wu field tests and analysis of the results • Computer computing, simulation of tunnel static using geotechnical results • Designing 2 HDD drilling path with length of 1400 m in a way that the drilling operation is perfectly possible and the time and cost of operation in Is at least possible