Investigating engineering studies and updating all of map surveys and data of the main pipelines of the gas, oil and liquid gas of the Karoon Oil and

Investigating engineering studies and updating all of map surveys and data of the main pipelines of the gas, oil and liquid gas of the  Karoon Oil and

Client: Ministry of oil- National Iranian south Oil company
Project's Geographical Location: in the scope of Ahvaz city - Khuzestan Province
Project Descripion:


Due to the lack of information resources and updated on all oil and gas installations, including 7 units of operation, 1 pump unit, 5 units of desalination, 10 units of gas pressure reinforcement and over 5000 km of pipelines related to auxiliary equipment, a project titled Studies Engineering and updating maps and digital information (spatial and descriptive) of all major oil pipelines, gas and industrial water pipelines (including water washing and effluents), all intersections and equipment available in their path, wellhead facility (production and injection Gas), the company's oil and gas production and its surroundings, also supplying the schematic for oil pumping systems in all operation units and pump oil pressure reinforcement houses were studied as follows, and the following items were updated.
• Preparation plan and oil and gas pipeline profile for 5000 km
• Preparation of maps (ISO) multi-way and pig of 18-way stations
• Utilization range maps of the number of 7 operation stations
• Preparation of isometric maps (ISO) pumping stations 49 number of operation stations