General specification | Catchment's area | 13300ha. |
Presenting promotional suggestion in the scope of region | Grass planting area | 110 ha. |
The transformation of low yielding land to pasture operation | 628.5 ha. | Construction trough | 8 |
Seeding | 810 ha. | Number of check contour trench | 2973 |
Drilling bowl pits operation | 1020 ha. | Presenting suitable agricultural pattern for farmlands | 3126 ha. |
Gabion dam | 35 | Stone putting in the riverbank | 1000 m |
Drilling Scales-shaped pits | 685 ha. | evaluation | 1128.6 km |
Establishing conservation stations and investigation | 7 | Root breeding operation | 120 ha. |
Operation area of Degradation forest restoration | 500 ha. | Area of pit-seeding | 800 ha. |
The number of dry- stone | 7159 | Number of light dams with wire braided | 1064 |
Earthen bands | 4 | Area of utilizing chemical fertilizer in Pasture | 1225 ha. |
Construction of biological dams | 25 ha. | | |