| General specification | Area of catchment | 45000ha. |
| Training - educational programs | Entire the plan area | pitting | 1458.5 ha. |
| Dry- stone dams | 24250 | Operation of the construction of Flaky shaped pits | 3149-6 ha. |
Number of crescent-shaped contour trench | 1579 | Trough Construction with insulation surfaces | 26 |
| Planting sapling | 1079.9ha. | conservation and protection after biological operation | 35549.4 |
| Planting twigs | 1506.3ha. | Dry-stone dams by the height 9-12 m | 4 |
| Pit- seeding | 2116.7ha. | The short earthen dam by the 6-12height | 30 |
| Seeding | 20143-4 | Management program of livestock and rangeland balancing | 44900ha. |
| Irrigation and maintenance | 12252.3 | The gabion dams by 3-5m height | 17 |