Details studies of Environmental Impacts Assessment Dezfuls water supplying
Client: Ministry of Energy- Khuzestan Water and Power Authority Project Geographical Location: Kuzestan province, dezful city and resistance regions nearby the river riparian Project description:
The Dezful water supplying is defined at the aim of supplying drinking water of Dezful city and its countryside from surface water resources (40%) and groundwater (60%). In this study, was applied Leopold method in order to reviewing the project's Impacts in constructing and exploiting phases. Also, Environmental Health Impact Assessment (EHIA), Environmental Social and Health Impact Assessment (ESHIA) and Strategic Effects Assessment (SEA), have been studied.