Employer: Khouzestan Government, Mollasani Municipality
Project location: Khouzestan Province, Mollasani county
Project Description:
Due to flat lands of Mollasani city, Mollasani residences and authorities always face the surface water disposal and storm water problems in this plan. Due to special social and technical issues, except sub channels, entire considerate channels were suggested and designed as indoor and buried. There is another point is consultant attempt in preparing gravity plan in order to sewerage and water disposal of Mollasani county. Despite the land's elevation of Mollasani county from the west to the east in Sazabpardazan's plan without utilizing pumping system ( that definitely has specific problems in operation period and by considering to intense characteristic and short term rains of Mollasani)
Mollasani's storm water were conducted in the East to the west ( in contrast with ,despite, general elevation) and maximum in 4 meter depth of surface land in Karun river