The first and second stages of plan management study and the west Karoon rivers and the south of Karkheh Noor areas drain water transmission to Persi
Employer: Ministry of Energy, Khouzestan Water and Energy Authority Project Geographical position: the south of the Karkhe river and the west of the Karoon river regions Project description: In order to predicting the drainage cannal quality and quantity , have been utilized of one modeling based on dynamic analysis system method in the WENISM programming space. The results have predicted the salinity and discharge fluctuated in short terms, middle terms and long terms (5,10and30 years) which have performed as the charts. Within plan, improved drain water transmission of Dashte Azadegan to Hoorolazim wetland ( no.4 reservior) on the other hand, the unimproved drain water transmission path in the length of 154 kilometer approximately which is started after drainage cannal that after gaining the south karkhe drainage and boarder water to safe area in Persian Gulf's margin is conducting In this approach the necessity of the first and second stages studies implementation of two plans is clear in order to access sustainable development. The important axis of the first studies implementation is as the follow:
Decreasing the drain water volume
Reusing drain water
Improve the quality of drain water
Drainage reservoirs
Investigating and study of irrigation network culture pattern
Study of impacts due to non- performance of 1,2,3,4 irrigation networks and subsurface drainage cannal at the same time
And the second stage studies were conducted in the below sectors: Study and designing of transmission plan drainage from the end of Ahvaz-Khoramshahr Study and designing of drain water transmission plan from the end of Ahvaz - Khorramshahr Road to Persian Gulf